Define charging use
Record vehicle and dwell-time goals without prescribing charger power.
EV project map
Coordinate stall, route, distribution, metering, load evidence, strata decisions, City requirements and project records.
Decision file
Record vehicle and dwell-time goals without prescribing charger power.
Document stall ownership or assignment, conduit path, fire separations, access, restoration and future shared infrastructure.
Record electrical-room, panel and transformer information available in approved building documents; do not enter restricted spaces.
Ask how building and unit capacity, diversity, load management and future stalls are evaluated.
Track bylaws, alteration requests, cost allocation, metering, maintenance, insurance questions and approvals.
Use the current Burnaby guide and project facts; do not treat incentive or approval as guaranteed.
Draw stall assignment, conduit or cable path, electrical rooms, walls, fire separations, distance, access and restoration. Use authorized records and safe access only; do not enter restricted rooms to collect missing information.
List approvals, bylaws, cost allocation, metering, insurance, maintenance, access and future-stall questions with their decision owner. Separate owner requests from council resolutions and keep accepted drawings attached to the authorization.
Connect the current Burnaby EV infrastructure guidance, qualified load work, proposed charger or management equipment and permit path. State which building-level assumptions remain unresolved and who must confirm them before procurement.
Combine charging-use goals, stall assignment, route drawing, common-property crossings, fire-separation details, distribution and load evidence, charger and management models, metering approach and future shared-infrastructure context. Attach strata decisions, current Burnaby guidance, electrical permit and inspection responsibilities and any BC Hydro dependency. Record access, shutdown, restoration and ongoing ownership. Revisions to route or equipment should reopen affected approvals. This package coordinates a specific installation and must not imply guaranteed charge time, available capacity, council approval or universal suitability from a charger rating alone. At handover, reconcile the authorized route, installed models, breaker and management settings, inspection record and strata conditions. Give the responsible owner the maintenance and access information for the actual installation.